High Bridge: A New Beginning
The High Bridge is slated to reopen as a walkway in summer 2015. Come hear Bryan Diffley, the Project Manager of the renovation, speak about NYC’s oldest standing bridge.
The High Bridge is slated to reopen as a walkway in summer 2015. Come hear Bryan Diffley, the Project Manager of the renovation, speak about NYC’s oldest standing bridge.
Considering the Quake: Seismic Design on the Edge explores the intersection between the aesthetics of architectural form and the technicality of structural design, through the lens of earthquake engineering.